{"id":1034,"date":"2023-08-15T19:10:00","date_gmt":"2023-08-15T17:10:00","guid":{"rendered":"https:\/\/franklin-nanclares.net\/?page_id=1034"},"modified":"2026-05-15T12:37:59","modified_gmt":"2026-05-15T10:37:59","slug":"freelancer-enginners-jobs","status":"publish","type":"page","link":"https:\/\/franklin-nanclares.net\/index.php\/freelancer-enginners-jobs\/","title":{"rendered":"Freelancer Network Operations Specialist- Jobs &#8211; Aut\u00f3nomo Espacialista en Telecomunicaciones &#8211; Trabajos"},"content":{"rendered":"\n<p>Freelancer Information &amp; Telecommunication Engineer and Intermediary for International Telecommunications companies such as: BT Group, GTT, NTT, Lyntia, Telecom, Horizon, Orange, Verizon, Comcast, Vodafone, ZTE, Huawei, Nippon. etc.<\/p>\n\n\n\n<p>For installation, maintenance, troubleshooting, reconfiguration, devices, cable switching, (Highs )&gt; wire verification, antenas and connection verification etc.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-text-align-center\"><strong>Rate 50\u20ac\/ Hour<\/strong> &#8212;<strong>OR&#8211; <\/strong> <strong>60\u20ac<\/strong> <strong>Depending on Requierments<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Rates may vary for frequent customers or for short-term or long-term contracts.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>&#8212; OTHER OPTIONS &#8212;<\/strong><\/p>\n\n\n\n<p><strong>8 Hours<\/strong> <strong>Pre-Purchased Package 300\u20ac<\/strong> + additional hour 50\u20ac \/ per hour &gt; <strong>Any Task will take Priority<\/strong><\/p>\n\n\n\n<p><strong>Transportation &amp; travel expenses, including the time it will take to get to the site, IS NOT included.<\/strong><\/p>\n\n\n\n<p>Please click on the image to check My Coverage area &amp; Travel cost<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2026\/04\/CoverageArea-TravelCost.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"429\" src=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2026\/04\/CoverageArea-TravelCost-1024x429.png\" alt=\"\" class=\"wp-image-1642\" style=\"aspect-ratio:2.3870289413978196;width:272px;height:auto\" srcset=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2026\/04\/CoverageArea-TravelCost-1024x429.png 1024w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2026\/04\/CoverageArea-TravelCost-300x126.png 300w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2026\/04\/CoverageArea-TravelCost-768x322.png 768w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2026\/04\/CoverageArea-TravelCost.png 1451w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><\/figure>\n<\/div>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>TOOLS &amp; Benefits<\/p>\n\n\n\n<p>All necesary tools for the IT \/ Network\/ IoT\/ Inmotic Duties<\/p>\n\n\n\n<p>++Insured \/ permit to work in the EU \/ CTAIMARegistered \/all documentaion required to enter in high standards business in Europe.<\/p>\n\n\n\n<p>Communication with a Native English \/Spanish Speaker<\/p>\n\n\n\n<p>I have my own Internet HOTSPOT<\/p>\n\n\n\n<p>All comunications tools &gt; Webex, Teams, Skype, Meet. Whatsapp, Telegram etc.<\/p>\n\n\n\n<p>Hardware &amp; tools:<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"527\" src=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240705_083249-1024x527.jpg\" alt=\"\" class=\"wp-image-1268\" srcset=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240705_083249-1024x527.jpg 1024w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240705_083249-300x154.jpg 300w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240705_083249-768x396.jpg 768w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240705_083249-1536x791.jpg 1536w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240705_083249-2048x1055.jpg 2048w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption class=\"wp-element-caption\">Equipment<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"467\" src=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240724_114641-1024x467.jpg\" alt=\"\" class=\"wp-image-1269\" srcset=\"https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240724_114641-1024x467.jpg 1024w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240724_114641-300x137.jpg 300w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240724_114641-768x350.jpg 768w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240724_114641-1536x700.jpg 1536w, https:\/\/franklin-nanclares.net\/wp-content\/uploads\/2024\/07\/IMG_20240724_114641-2048x934.jpg 2048w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption class=\"wp-element-caption\">Tools<\/figcaption><\/figure>\n\n\n\n<p>EMEA + LATAM<\/p>\n\n\n\n<p>Installation &amp; Initial configuration of: Routers, Switches, Firewalls, MD, Fiber Modules, Copper, Fiber, Ethernet, Servers, FireEye, Console, IP Cams, Counter people sensors, PCs, Servers, Inmotic, AI, &amp;  IoT related.<\/p>\n\n\n\n<p>+Remote Support<\/p>\n\n\n\n<p>Drone for highs verification and control; towers, antenas, cables, and satelite etc.<\/p>\n\n\n\n<p>National companies, Telefonica, MasMovil &gt;Telecable, R, Euskaltel, Retevision, Cellnex, Lynthia Networks<\/p>\n\n\n\n<p>My Last jobs:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>24\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Failure \/ Replacement<\/td><\/tr><tr><td>Client Company<\/td><td>MAS MOVIL<\/td><\/tr><tr><td>City<\/td><td>Aviles, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>24\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>TC Core Unit replacement and sensors reconfiguration<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>23\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Project Installation Planning<\/td><\/tr><tr><td>Client Company<\/td><td>SILBON, Gijon<\/td><\/tr><tr><td>City<\/td><td>Gij\u00f3n, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>23\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Take pictures, and Take measurements of the width and height of the premises and way to get power for the sensor devices TC core, interior and exterior sensors.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>21\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Failure \/ Replacement<\/td><\/tr><tr><td>Client Company<\/td><td> MUY MUCHO Oviedo<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>21\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td> Exterior sensors replacement<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>21\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Failure \/ Replacemente<\/td><\/tr><tr><td>Client Company<\/td><td>FORUM SPORT, Oviedo<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>21\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td> Exterior sensors replacement<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>21\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Failure \/ Replacemente<\/td><\/tr><tr><td>Client Company<\/td><td>PEPCO C.C Los Prados Oviedo<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>21\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td> Exterior sensors replacement<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>07\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>TC Group Solutions<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.tcgroupsolutions.com\/\">https:\/\/www.tcgroupsolutions.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>LOLA CASADEMUNT<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>07\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Wirelss sensors, and gateway intallation on changer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>07\/04\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>PEPCO C.C Los Prados Oviedo<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>07\/04\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>TC Core, Interior and Exterior sensors, cabling, and brackets installation. <\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>31\/03\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>Mirame<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/mirame.net\/\">https:\/\/mirame.net\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Failure<\/td><\/tr><tr><td>Client Company<\/td><td>MAYORAL<\/td><\/tr><tr><td>City<\/td><td>Gij\u00f3n,  Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>31\/03\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Check hardware and change batteries <\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>19\/03\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Project Installation Planning<\/td><\/tr><tr><td>Client Company<\/td><td>BINAMI<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>19\/03\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Take pictures, and Take measurements of the width and height of the premises and way to get power for the sensor devices TC core, interior and exterior sensors.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>18\/02\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Life Concept<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>18\/02\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Interior and exterior sensor, camara persons counts, and Wireless TC core Installation <\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>16\/02\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Incident<\/td><\/tr><tr><td>Client Company<\/td><td>LA CASA DE LAS CARCASAS<\/td><\/tr><tr><td>City<\/td><td>Lugones, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>16\/02\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>TC Core Installation\/ hardware sustution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>09\/02\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>Orbit Pulse<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.orbitpulse365.com\/\">https:\/\/www.orbitpulse365.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td> Router &amp; Switch Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Bayer Hispania S.L.<\/td><\/tr><tr><td>City<\/td><td>Langreo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>09\/02\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Installation of sensor, camara persons counts, and Switch POE<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>06\/02\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Life Concept<\/td><\/tr><tr><td>City<\/td><td>Valle del Nalon, El Entrego Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>06\/02\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Installation of sensor, camara persons counts, and Switch POE<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>05\/02\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>IT BASE <\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Project installation Planning <\/td><\/tr><tr><td>Client Company<\/td><td>Life Concept<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>05\/02\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Take pictures, and Take measurements of the width and height of the premises and way to get power for the sensor devices TC core, interior and exterior sensors.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>09\/1\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>MD Tech IT &#8211; <strong>NTT<\/strong><\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.md-tech.it\/\">https:\/\/www.md-tech.it\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Cisco Switch and Cradle Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Loomis<\/td><\/tr><tr><td>City<\/td><td>Malia\u00f1o, Cantabria<\/td><\/tr><tr><td>Complete Date<\/td><td>09\/01\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Cisco  Switch and Cradle Installation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>7\/1\/2026<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBase <\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Wide TV \/ Wireless \/ Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Travel TT<\/td><\/tr><tr><td>City<\/td><td>Casta\u00f1era, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>7\/1\/2026<\/td><\/tr><tr><td>Job Description<\/td><td>Wide TV \/ Wireless \/ Installation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>16\/12\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>New Era Technologies<\/td><\/tr><tr><td>Company Info<\/td><td>Technova Technologies<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>UPS Network Reconfiguration<\/td><\/tr><tr><td>Client Company<\/td><td>Stryker Corporation<\/td><\/tr><tr><td>City<\/td><td>La Coru\u00f1a<\/td><\/tr><tr><td>Complete Date<\/td><td>16\/12\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Troubleshooting and UPS Network Reconfiguration<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>10\/12\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>AR Global Techs<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/arglobaltechs.com\/\">https:\/\/arglobaltechs.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Wireless Router Installation<\/td><\/tr><tr><td>Client Company<\/td><td>DHL<\/td><\/tr><tr><td>City<\/td><td>Jundiz Kalea, Vitoria<\/td><\/tr><tr><td>Complete Date<\/td><td>10\/12\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Wireless Router Installation &amp; Configuration<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>03\/12\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Uninstallation Hardware<\/td><\/tr><tr><td>Client Company<\/td><td>Mirame<\/td><\/tr><tr><td>City<\/td><td>C.C Parque Principado, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>03\/12\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Remove personal count cameras<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>25\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Movil Software update<\/td><\/tr><tr><td>Client Company<\/td><td>AVIS BUDGET<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>25\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Movil software update<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>25\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>AVIS BUDGET<\/td><\/tr><tr><td>City<\/td><td>Aeropuerto de  Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>25\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Printer Installation and configuration<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>17\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>MasMovil<\/td><\/tr><tr><td>City<\/td><td>Piedras Blancas , Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>18\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Installation and configuration of People counter sensors<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>17\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation<\/td><\/tr><tr><td>Client Company<\/td><td>BRICO DEPOT<\/td><\/tr><tr><td>City<\/td><td>Fafil\u00e1n , Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>21\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Installation and configuration of People counter sensors<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><br>Date<\/td><td>14\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>ITBASE<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.itbase.es\/\">https:\/\/www.itbase.es\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware Installation <\/td><\/tr><tr><td>Client Company<\/td><td>New Era \/ Columbia<\/td><\/tr><tr><td>City<\/td><td>Siero, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>20\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Installation and configuration of People counter sensors<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>13\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>MD Tech IT &#8211; <strong>GTT<\/strong><\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.md-tech.it\/\">https:\/\/www.md-tech.it\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware <\/td><\/tr><tr><td>Client Company<\/td><td>Rituals Cosmetics<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>13\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Add and configure a Cisco switch  C927-4PM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>12\/11\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>MD Tech IT  &#8211; GTT<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.md-tech.it\/\">https:\/\/www.md-tech.it\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Hardware <\/td><\/tr><tr><td>Client Company<\/td><td>Rituals Cosmetics<\/td><\/tr><tr><td>City<\/td><td>Leon<\/td><\/tr><tr><td>Complete Date<\/td><td>12\/11\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Add and configure a Cisco switch  C927-4PM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>15\/10\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>A Coru\u00f1a, Galicia<\/td><\/tr><tr><td>Complete Date<\/td><td>15\/10\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 4 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>08\/10\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Torrejon de Ardoz, Madrid<\/td><\/tr><tr><td>Complete Date<\/td><td>08\/10\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 4 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>01\/10\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Gij\u00f3n, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>01\/10\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>30\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>30\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>25\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Callao, Madrid, ECI<\/td><\/tr><tr><td>Complete Date<\/td><td>25\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>23\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Santander, Cantabria<\/td><\/tr><tr><td>Complete Date<\/td><td>23\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>17\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Alava, Vitoria<\/td><\/tr><tr><td>Complete Date<\/td><td>17\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 4 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>15\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Valladolid<\/td><\/tr><tr><td>Complete Date<\/td><td>15\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>09\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Salamanca, ECI<\/td><\/tr><tr><td>Complete Date<\/td><td>10\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>04\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Parquesur, Madrid, ECI<\/td><\/tr><tr><td>Complete Date<\/td><td>04\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>03\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Dehesa, Madrid, ECI<\/td><\/tr><tr><td>Complete Date<\/td><td>03\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>02\/09\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>B.I.D<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/pomeroy.com\/\">https:\/\/pomeroy.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Optica 2000<\/td><\/tr><tr><td>City<\/td><td>Callao, Madrid, ECI<\/td><\/tr><tr><td>Complete Date<\/td><td>02\/09\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Change 5 Different workstation, printers, scanners, hardware configuration, tracer (Glasses Frame) Configuration, Switch Installation and ethernet port aligment store to patch panel to switch, Check and verify the new software and apps works correctly<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>27\/06\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td><a href=\"https:\/\/www.procurri.com\/\">UP Tech IT Services<\/a><\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.linkedin.com\/company\/uptechliveitservices\">https:\/\/www.linkedin.com\/company\/uptechliveitservices<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Re-configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Primark<\/td><\/tr><tr><td>City<\/td><td>Lugo, Coru\u00f1a<\/td><\/tr><tr><td>Complete Date<\/td><td>21\/08\/2025<\/td><\/tr><tr><td>Job Description<\/td><td><br>Unistall 3 Access point and Reconfigure get serial numbers report to remote engineers<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>27\/06\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td><a href=\"https:\/\/franklin-nanclares.net\/index.php\/blacklisted-business\/\" data-type=\"page\" data-id=\"1555\"><strong>Ghazi Tech Services LTD **Blacklisted DO NOT Paid the engineers<\/strong><\/a><\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/franklin-nanclares.net\/index.php\/blacklisted-business\/\" data-type=\"page\" data-id=\"1555\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>BLACKLISTED BUSINESS<\/strong><\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>New Connections<\/td><\/tr><tr><td>Client Company<\/td><td>Vorwerk<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>27\/06\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Install, configure  &amp; connect 3 Network Devices (LANCOM Router, Switch, &amp; Access point)<br>mount AP on ceiling &amp; patching, labeling<br>Communicate with NOC to very correct installation of devices<br>remove old devices from site<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>05\/06\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>Procurri<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.procurri.com\/\">https:\/\/www.procurri.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration \/ Switches \/ Network<\/td><\/tr><tr><td>Client Company<\/td><td>DAIMLER \/ MERCEDES<\/td><\/tr><tr><td>City<\/td><td>Coru\u00f1a, Galicia<\/td><\/tr><tr><td>Complete Date<\/td><td>05\/06\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Hands and feet support:&nbsp; Provide putty console connection and access to the switch and make ip range network changes <br>Print configuration<br>PC configuration<br>some patch panel, wall ports<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>03\/06\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>Connect B2B Limited.<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/techconnectb2b.com\/\">https:\/\/techconnectb2b.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Switch Change<\/td><\/tr><tr><td>Client Company<\/td><td>Jack Salazar  \/ Paula G.<\/td><\/tr><tr><td>City<\/td><td>Oviedo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>03\/06\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Verifiy the connection, check all patchs ports, and make network diagram, after this old switch was taken out, replace for the new one, make sure all network connections were fine (all PCs, printers, servers, APs, etc)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><br>Date<\/td><td>24\/4\/2025<\/td><\/tr><tr><td>Contract Company<\/td><td>Procurri<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/www.procurri.com\/\">https:\/\/www.procurri.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Migration \/ Switches \/ Network<\/td><\/tr><tr><td>Client Company<\/td><td>DAIMLER \/ MERCEDES<\/td><\/tr><tr><td>City<\/td><td>Coru\u00f1a, Galicia<\/td><\/tr><tr><td>Complete Date<\/td><td>24\/4\/2025<\/td><\/tr><tr><td>Job Description<\/td><td>Migration \/ Switches \/ Network<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>13\/9\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Centrix Global <\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/centrixglobal.co.uk\/\">https:\/\/centrixglobal.co.uk\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Cisco Switch  IOS Upgrading <\/td><\/tr><tr><td>Client Company<\/td><td>Minova International<\/td><\/tr><tr><td>City<\/td><td>Langreo, Spain<\/td><\/tr><tr><td>Complete Date<\/td><td>13\/9\/2024<\/td><\/tr><tr><td>Job Description<\/td><td>Cisco Switch IOS Upgrading<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Date<\/td><td>3\/9\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Waves Tech<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/wavestech.co\/\">https:\/\/wavestech.co\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Connect one BT Line and verify other 3<\/td><\/tr><tr><td>Client Company<\/td><td>Primark<\/td><\/tr><tr><td>City<\/td><td>Melilla, Spain<\/td><\/tr><tr><td>Complete Date<\/td><td>3\/9\/2024<\/td><\/tr><tr><td>Job Description<\/td><td>3 BT Voice Lines has been verified and a new Fiber line has been Installed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>21\/5\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Multiplier Support Services<\/td><\/tr><tr><td>Company Info<\/td><td><a href=\"https:\/\/multiplieriss.com\/\">https:\/\/multiplieriss.com\/<\/a><\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Switch re-establisment \/ re-configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Stryker &#8211; Remeco<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>21-05-2024<\/td><\/tr><tr><td>Job Description<\/td><td>When I I finally connect with the engineer via teams, we have to  identified the correct switch to connect because were 3 switches and  (<em>because switches were unlabeled<\/em>)  so we can find the problem<br>After this I connect to the switch Cisco Switch 3850 #1 via putty &gt; console<br><em>Share my screen with the remote engineer  all the time<\/em><br><em>&nbsp;<\/em><br>I reboot the switch, many times, and after this we download a cisco image and save and a usb drive, then I use this copy and install the usb drive into the switch.<br><em>We make a usb copyflash0:+name of the cisco image to reconfigured the switch.<\/em><br><em>(Seems like the switch was configured but not saved in the flash memory, power when off and that is why did not worked)<\/em><br><em>After this was done,  I ask everyone in the office and they can access everything they need.<\/em><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>30\/4\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Switch,&nbsp; Access point &amp; Printer configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Minova International<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>Incomplete<\/td><\/tr><tr><td>Job Description<\/td><td>Local assistance for the configuration and local installation on site devices: complete Minovas Networks Configuration. My first task was to find the cable that goes from the main cisco switch to the factory, this cable was tag&nbsp; PP and Explain how the networks was connected: Factory cable conexion goes to a TPlink router\/Switch\/ with wifi conection has multiple wired conexion, (Computers, printers, prod machines and another switch ) this device also have 4 repeters, i also help defined how the networks works or get the DHCP to differents devices.&nbsp;<br>I also move one access point to the end of the office &amp; connected to wall port # 6 \/PP A #6 \/SW port #45 . I also configure the office printer to get DHCP from Cisco AP and connect to (Minovas Corp1) I fix a user computer conexi\u00f3n, Try to connect IP phone to the networks but was not possible.<br><br><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>24\/4\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>SDWAN, Switch, and Access point configuration \/ Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Minova International<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>Incomplete<\/td><\/tr><tr><td>Job Description<\/td><td>Local assistance for the configuration and local installation on site devices: complete Minovas Networks Configuration. When i arrive we found conexion problems with the Movistar Modem to the SDWAN. and i start looking for the conexion problem,&nbsp; after few hours we found that one of the SW Ports of the modem was not working givin us conexion to the SDWAN, we have to connect cable to the old switch was the only way to get connection to internet.<br>Assistance is required to complete the taks, assist the engineers to complete access point corporate wifi and install the devices. &#8212; Rack needs to be fix so the devices a cables fits in correctly.<br>After this i start changing all cables to the new Cisco switch<br><br>The only cable i have connected to the old switch was the SDWAN that provide internet to everything at the moment.<br><br>the majorty of the cables were identified like this:<br>SW Port 3 to Patch Panel # 3<br>SW Port 5 to Patch Panel # 5<br>SW Port 8 to Patch Panel # 8<br>SW Port 9 to Patch Panel # 9 office AP &#8211; Printer connected via WIFI to this AP<br>SW Port 10 to Patch Panel # 10 originally to printer but this was not configure so i put one of the new Cisco AP Temporary<br>SW Port 11 to Patch Panel # 11<br>SW Port 12 to Patch Panel # 12<br>SW Port 13 to Patch Panel # 13<br>SW Port 24 to Secondt Patch Panel # 24<br>SW Port 30 to Computer Server in Rack<br>SW Port 45 to Cisco AP1<br>SW Port 46 to Cisco AP2<br>SW Port 48 to SDWAN Port LAN3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>17\/4\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>SDWAN, Switch, and Access point configuration \/ Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Minova International<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>Incomplete<\/td><\/tr><tr><td>Job Description<\/td><td>Local assistance for the configuration and local installation on site devices: complete the Palo alto SDWAN configuration, and start with the&nbsp; Cisco Switch and Two Cisco Access points. This were connected ia console for initial configuration and contact to RE via webvex to meet with engineers and make complete Minovas network parameters,&nbsp; Console SDWAN, Console Switch, and Console every AP, Devices were tag with the correct network device name but not install in the rack or AP on the ceiling (instruccions given by Aditya Bhoyarkar) RE engineers have many problems conigurating the every single device, they encounter problems for the SDWAN, with the Switch and with the Access Points every problem was totaly different , and to make make works as suppost to. I assist and everything they told me.&nbsp;<br>The Switch was configuratly done but they couldnt find the problem or reason why the AP&nbsp; did not workwith he employees computer &#8211; this did not connect to the corporate WIFI. &#8212;&#8212;&#8212;&#8212;&#8212;All devices are NOT installed,&nbsp; they are on top of the Rack,&nbsp;<br>Assistance is required to complete the taks, assist the engineers to complete access point corporate wifi and install the devices. &#8212; Rack needs to be fix so the devices a cables fits in correctly.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>16\/4\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>SDWAN Configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Minova International<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>Incomplete<\/td><\/tr><tr><td>Job Description<\/td><td>Local assistance for the configuration and local installation on site device: Palo Alto SDWAN configuration,&nbsp; This were connected ia console for initial configuration and contact to RE via webvex to meet with engineers and make Minovas \/ ISP security network parameters,&nbsp; RE engineers have many problems conigurating the device&nbsp; I assist and everything they told me.&nbsp;<br>The configuration of the SDWAN&nbsp; was incomplete&nbsp;<br>Assistance is required to complete the taks, assist the engineers to complete the configurion of Cisco Switch and access points and rack devices<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>03\/22\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>BT Group \/ Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Firewall and Switch Configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Minova<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>03\/22\/2024<\/td><\/tr><tr><td>Job Description<\/td><td>Out the box devices One Palo Alto Firewall and One Cisco c930048P-E Switch.<br>Make inicial configuration to the firewall and the switch via console cable so the engineers from Minova configure the Network<br>install both devices in the rack and switch \/ change to the appropiate cables.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>01\/25\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>BT Group \/ Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Firewall and Switch Configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Minova<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>03\/22\/2024<\/td><\/tr><tr><td>Job Description<\/td><td>Out the box devices One Palo Alto Firewall and One Cisco c930048P-E Switch.<br>Make inicial configuration to the firewall and the switch via console cable so the engineers from Minova configure the Network<br> install both devices in the rack and switch \/ change to the appropiate cables.  <\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>01\/25\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>BT Group \/ Tech Source Managed Services<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/techsource-managed.com.au\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Server Configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Minova<\/td><\/tr><tr><td>City<\/td><td>Langreo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>01\/25\/2024<\/td><\/tr><tr><td>Job Description<\/td><td>Locate a Server and NIC Port, and connect a new Ethernet cable between Network switch and server NIC port.<br>Might need to provide console access of the switch, trace cables between devices, assist in device configuration.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>01\/15\/2024<\/td><\/tr><tr><td>Contract Company<\/td><td>PMAS Technologies<\/td><\/tr><tr><td>Company Info<\/td><td>www.pmastechs.com<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Firewall Migration<\/td><\/tr><tr><td>Client Company<\/td><td>Calderys<\/td><\/tr><tr><td>City<\/td><td>Tema\u00f1es, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>01\/16\/2024<\/td><\/tr><tr><td>Job Description<\/td><td>A new device need it to be configure and to be install and the rack.<br>Device: Palo Alto PA-400 firewall <br>Configure the IP address and other parameters by console, <br>updated to lates software, via http por 80.<br>Switch the old firewall and cables for the new one,<br>Then connect via Meet with the configuration team from NNT France<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>09\/25\/2023<\/td><\/tr><tr><td>Contract Company<\/td><td>Brilliant Tech Services LTD<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/btsserv.com\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Software and Till  Cashier Register installation<\/td><\/tr><tr><td>Client Company<\/td><td>Pandora&#8217;s boutique store<\/td><\/tr><tr><td>City<\/td><td>Siero, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>09\/25\/2023<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>08\/31\/2023<\/td><\/tr><tr><td>Contract Company<\/td><td>Canopus IT solutions for &gt; https:\/\/esp-global.com\/<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/www.canopusit.com\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Switch Installation<\/td><\/tr><tr><td>Client Company<\/td><td><\/td><\/tr><tr><td>City<\/td><td>Oviedo<\/td><\/tr><tr><td>Complete Date<\/td><td>08\/31\/2023<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>08\/23\/2023<\/td><\/tr><tr><td>Contract Company<\/td><td>BT \/ Meta Invictus UK<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/the-meta-i.com\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Swicth Installation &amp; Configuration<\/td><\/tr><tr><td>Client Company<\/td><td>Minova<\/td><\/tr><tr><td>City<\/td><td>Langreo, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>08\/23\/2023<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Date<\/td><td class=\"has-text-align-left\" data-align=\"left\">08\/09\/2023<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Contract Company<\/td><td class=\"has-text-align-left\" data-align=\"left\">BT \/ Meta Invictus UK<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Company Info<\/td><td class=\"has-text-align-left\" data-align=\"left\">https:\/\/the-meta-i.com\/<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Activity \/ Task<\/td><td class=\"has-text-align-left\" data-align=\"left\">SDWAN Migration<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Client Company<\/td><td class=\"has-text-align-left\" data-align=\"left\">Minova<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">City<\/td><td class=\"has-text-align-left\" data-align=\"left\">Langreo, Asturias<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Complete Date<\/td><td class=\"has-text-align-left\" data-align=\"left\">08\/09\/2023<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>06\/22\/2023<\/td><\/tr><tr><td>Contract Company<\/td><td>SSE Global Technologies Inc.<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/www.ssetechs.com\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>Remote Assitance to CPE \/ NTTGN Installation<\/td><\/tr><tr><td>Client Company<\/td><td>Heraeus Electro-Nite  \/ Poligono de Asipo<\/td><\/tr><tr><td>City<\/td><td>Llanera, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>06\/22\/2023<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Date<\/td><td>01\/19\/2023<\/td><\/tr><tr><td>Contract Company<\/td><td>SSE Global Technologies Inc.<\/td><\/tr><tr><td>Company Info<\/td><td>https:\/\/www.ssetechs.com\/<\/td><\/tr><tr><td>Activity \/ Task<\/td><td>HBA\/FC Replacement Nimble  \/HPE<\/td><\/tr><tr><td>Client Company<\/td><td>Nestle<\/td><\/tr><tr><td>City<\/td><td>Gijon, Asturias<\/td><\/tr><tr><td>Complete Date<\/td><td>01\/19\/2023<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Freelancer Information &amp; Telecommunication Engineer and Intermediary for International Telecommunications companies such as: BT Group, GTT, NTT, Lyntia, Telecom, Horizon, Orange, Verizon, Comcast, Vodafone, ZTE, Huawei, Nippon. etc. For installation, maintenance, troubleshooting, reconfiguration, devices, cable switching, (Highs )&gt; wire verification, antenas and connection verification etc. Rate 50\u20ac\/ Hour &#8212;OR&#8211; 60\u20ac Depending on Requierments Rates may &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/franklin-nanclares.net\/index.php\/freelancer-enginners-jobs\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abFreelancer Network Operations Specialist- Jobs &#8211; Aut\u00f3nomo Espacialista en Telecomunicaciones &#8211; Trabajos\u00bb<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1034","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/pages\/1034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/comments?post=1034"}],"version-history":[{"count":76,"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/pages\/1034\/revisions"}],"predecessor-version":[{"id":1648,"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/pages\/1034\/revisions\/1648"}],"wp:attachment":[{"href":"https:\/\/franklin-nanclares.net\/index.php\/wp-json\/wp\/v2\/media?parent=1034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}