Freelancer Information & Telecommunication Engineer and Intermediary for International Telecommunications companies such as: BT Group, GTT, NTT, Lyntia, Telecom, Horizon, Orange, Verizon, Comcast, Vodafone, ZTE, Huawei, Nippon. etc.
For installation, maintenance, troubleshooting, reconfiguration, devices, cable switching, (Highs )> wire verification, antenas and connection verification etc.
Rate 40€/ Hour —OR–
8 Hours Pre-Purchased Package 300€ + additional hour 40€ / per hour
Transportation & travel expenses, including the time it will take to get to the site, IS NOT included.
**Please ask for quotation.
TOOLS & Benefits
All necesary tools for the Network Duties
++Insured
Communication with a Native English Speaker
I have my own Internet HOTSPOT
All comunications tools > Webex, Teams, Skype, Meet. Whatsapp etc


EMEA + LATAM
Installation & Initial configuration of: Routers, Switches, Firewalls, MD, Fiber Modules, Copper, Fiber, Ethernet, Servers, FireEye, Console.
+Remote Support
Drone for highs verification and control; towers, antenas, cables, and satelite etc.
National companies, Telefonica, MasMovil >Telecable, R, Euskaltel, Retevision, Cellnex
My Last jobs
Date | 05/06/2025 |
Contract Company | Procurri |
Company Info | https://www.procurri.com/ |
Activity / Task | Migration / Switches / Network |
Client Company | DAIMLER / MERCEDES |
City | Coruña, Galicia |
Complete Date | 05/06/2025 |
Job Description | Hands and feet support: Provide putty console connection and access to the switch and make ip range network changes Print configuration PC configuration some patch panel, wall ports |
Date | 03/06/2025 |
Contract Company | Connect B2B Limited. |
Company Info | https://techconnectb2b.com/ |
Activity / Task | Switch Change |
Client Company | Jack Salazar / Paula G. |
City | Oviedo, Asturias |
Complete Date | 03/06/2025 |
Job Description | Verifiy the connection, check all patchs ports, and make network diagram, after this old switch was taken out, replace for the new one, make sure all network connections were fine (all PCs, printers, servers, APs, etc) |
Date | 24/4/2025 |
Contract Company | Procurri |
Company Info | https://www.procurri.com/ |
Activity / Task | Migration / Switches / Network |
Client Company | DAIMLER / MERCEDES |
City | Coruña, Galicia |
Complete Date | 24/4/2025 |
Job Description | Migration / Switches / Network |
Date | 13/9/2024 |
Contract Company | Centrix Global |
Company Info | https://centrixglobal.co.uk/ |
Activity / Task | Cisco Switch IOS Upgrading |
Client Company | Minova International |
City | Langreo, Spain |
Complete Date | 13/9/2024 |
Job Description | Cisco Switch IOS Upgrading |
Date | 3/9/2024 |
Contract Company | Waves Tech |
Company Info | https://wavestech.co/ |
Activity / Task | Connect one BT Line and verify other 3 |
Client Company | Primark |
City | Melilla, Spain |
Complete Date | 3/9/2024 |
Job Description | 3 BT Voice Lines has been verified and a new Fiber line has been Installed |
Date | 21/5/2024 |
Contract Company | Multiplier Support Services |
Company Info | https://multiplieriss.com/ |
Activity / Task | Switch re-establisment / re-configuration |
Client Company | Stryker – Remeco |
City | Gijon, Asturias |
Complete Date | 21-05-2024 |
Job Description | When I I finally connect with the engineer via teams, we have to identified the correct switch to connect because were 3 switches and (because switches were unlabeled) so we can find the problem After this I connect to the switch Cisco Switch 3850 #1 via putty > console Share my screen with the remote engineer all the time I reboot the switch, many times, and after this we download a cisco image and save and a usb drive, then I use this copy and install the usb drive into the switch. We make a usb copyflash0:+name of the cisco image to reconfigured the switch. (Seems like the switch was configured but not saved in the flash memory, power when off and that is why did not worked) After this was done, I ask everyone in the office and they can access everything they need. |
Date | 30/4/2024 |
Contract Company | Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | Switch, Access point & Printer configuration |
Client Company | Minova International |
City | Gijon, Asturias |
Complete Date | Incomplete |
Job Description | Local assistance for the configuration and local installation on site devices: complete Minovas Networks Configuration. My first task was to find the cable that goes from the main cisco switch to the factory, this cable was tag PP and Explain how the networks was connected: Factory cable conexion goes to a TPlink router/Switch/ with wifi conection has multiple wired conexion, (Computers, printers, prod machines and another switch ) this device also have 4 repeters, i also help defined how the networks works or get the DHCP to differents devices. I also move one access point to the end of the office & connected to wall port # 6 /PP A #6 /SW port #45 . I also configure the office printer to get DHCP from Cisco AP and connect to (Minovas Corp1) I fix a user computer conexión, Try to connect IP phone to the networks but was not possible. |
Date | 24/4/2024 |
Contract Company | Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | SDWAN, Switch, and Access point configuration / Installation |
Client Company | Minova International |
City | Gijon, Asturias |
Complete Date | Incomplete |
Job Description | Local assistance for the configuration and local installation on site devices: complete Minovas Networks Configuration. When i arrive we found conexion problems with the Movistar Modem to the SDWAN. and i start looking for the conexion problem, after few hours we found that one of the SW Ports of the modem was not working givin us conexion to the SDWAN, we have to connect cable to the old switch was the only way to get connection to internet. Assistance is required to complete the taks, assist the engineers to complete access point corporate wifi and install the devices. — Rack needs to be fix so the devices a cables fits in correctly. After this i start changing all cables to the new Cisco switch The only cable i have connected to the old switch was the SDWAN that provide internet to everything at the moment. the majorty of the cables were identified like this: SW Port 3 to Patch Panel # 3 SW Port 5 to Patch Panel # 5 SW Port 8 to Patch Panel # 8 SW Port 9 to Patch Panel # 9 office AP – Printer connected via WIFI to this AP SW Port 10 to Patch Panel # 10 originally to printer but this was not configure so i put one of the new Cisco AP Temporary SW Port 11 to Patch Panel # 11 SW Port 12 to Patch Panel # 12 SW Port 13 to Patch Panel # 13 SW Port 24 to Secondt Patch Panel # 24 SW Port 30 to Computer Server in Rack SW Port 45 to Cisco AP1 SW Port 46 to Cisco AP2 SW Port 48 to SDWAN Port LAN3 |
Date | 17/4/2024 |
Contract Company | Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | SDWAN, Switch, and Access point configuration / Installation |
Client Company | Minova International |
City | Gijon, Asturias |
Complete Date | Incomplete |
Job Description | Local assistance for the configuration and local installation on site devices: complete the Palo alto SDWAN configuration, and start with the Cisco Switch and Two Cisco Access points. This were connected ia console for initial configuration and contact to RE via webvex to meet with engineers and make complete Minovas network parameters, Console SDWAN, Console Switch, and Console every AP, Devices were tag with the correct network device name but not install in the rack or AP on the ceiling (instruccions given by Aditya Bhoyarkar) RE engineers have many problems conigurating the every single device, they encounter problems for the SDWAN, with the Switch and with the Access Points every problem was totaly different , and to make make works as suppost to. I assist and everything they told me. The Switch was configuratly done but they couldnt find the problem or reason why the AP did not workwith he employees computer – this did not connect to the corporate WIFI. —————All devices are NOT installed, they are on top of the Rack, Assistance is required to complete the taks, assist the engineers to complete access point corporate wifi and install the devices. — Rack needs to be fix so the devices a cables fits in correctly. |
Date | 16/4/2024 |
Contract Company | Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | SDWAN Configuration |
Client Company | Minova International |
City | Gijon, Asturias |
Complete Date | Incomplete |
Job Description | Local assistance for the configuration and local installation on site device: Palo Alto SDWAN configuration, This were connected ia console for initial configuration and contact to RE via webvex to meet with engineers and make Minovas / ISP security network parameters, RE engineers have many problems conigurating the device I assist and everything they told me. The configuration of the SDWAN was incomplete Assistance is required to complete the taks, assist the engineers to complete the configurion of Cisco Switch and access points and rack devices |
Date | 03/22/2024 |
Contract Company | BT Group / Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | Firewall and Switch Configuration |
Client Company | Minova |
City | Gijon, Asturias |
Complete Date | 03/22/2024 |
Job Description | Out the box devices One Palo Alto Firewall and One Cisco c930048P-E Switch. Make inicial configuration to the firewall and the switch via console cable so the engineers from Minova configure the Network install both devices in the rack and switch / change to the appropiate cables. |
Date | 01/25/2024 |
Contract Company | BT Group / Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | Firewall and Switch Configuration |
Client Company | Minova |
City | Gijon, Asturias |
Complete Date | 03/22/2024 |
Job Description | Out the box devices One Palo Alto Firewall and One Cisco c930048P-E Switch. Make inicial configuration to the firewall and the switch via console cable so the engineers from Minova configure the Network install both devices in the rack and switch / change to the appropiate cables. |
Date | 01/25/2024 |
Contract Company | BT Group / Tech Source Managed Services |
Company Info | https://techsource-managed.com.au/ |
Activity / Task | Server Configuration |
Client Company | Minova |
City | Langreo, Asturias |
Complete Date | 01/25/2024 |
Job Description | Locate a Server and NIC Port, and connect a new Ethernet cable between Network switch and server NIC port. Might need to provide console access of the switch, trace cables between devices, assist in device configuration. |
Date | 01/15/2024 |
Contract Company | PMAS Technologies |
Company Info | www.pmastechs.com |
Activity / Task | Firewall Migration |
Client Company | Calderys |
City | Temañes, Asturias |
Complete Date | 01/16/2024 |
Job Description | A new device need it to be configure and to be install and the rack. Device: Palo Alto PA-400 firewall Configure the IP address and other parameters by console, updated to lates software, via http por 80. Switch the old firewall and cables for the new one, Then connect via Meet with the configuration team from NNT France |
Date | 09/25/2023 |
Contract Company | Brilliant Tech Services LTD |
Company Info | https://btsserv.com/ |
Activity / Task | Software and Till Cashier Register installation |
Client Company | Pandora’s boutique store |
City | Siero, Asturias |
Complete Date | 09/25/2023 |
Date | 08/31/2023 |
Contract Company | Canopus IT solutions for > https://esp-global.com/ |
Company Info | https://www.canopusit.com/ |
Activity / Task | Switch Installation |
Client Company | |
City | Oviedo |
Complete Date | 08/31/2023 |
Date | 08/23/2023 |
Contract Company | BT / Meta Invictus UK |
Company Info | https://the-meta-i.com/ |
Activity / Task | Swicth Installation & Configuration |
Client Company | Minova |
City | Langreo, Asturias |
Complete Date | 08/23/2023 |
Date | 08/09/2023 |
Contract Company | BT / Meta Invictus UK |
Company Info | https://the-meta-i.com/ |
Activity / Task | SDWAN Migration |
Client Company | Minova |
City | Langreo, Asturias |
Complete Date | 08/09/2023 |
Date | 06/22/2023 |
Contract Company | SSE Global Technologies Inc. |
Company Info | https://www.ssetechs.com/ |
Activity / Task | Remote Assitance to CPE / NTTGN Installation |
Client Company | Heraeus Electro-Nite / Poligono de Asipo |
City | Llanera, Asturias |
Complete Date | 06/22/2023 |
Date | 01/19/2023 |
Contract Company | SSE Global Technologies Inc. |
Company Info | https://www.ssetechs.com/ |
Activity / Task | HBA/FC Replacement Nimble /HPE |
Client Company | Nestle |
City | Gijon, Asturias |
Complete Date | 01/19/2023 |