| Date | 08/05/2026 |
| Contract Company | TC Group / ITBASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | Bimani |
| City | Oviedo |
| Complete Date | 08/05/2026 |
| Task Description | I proceeded to install the photocell, and the cable that the electrician had supposedly provided for the installation was just a decorative cable because when I pulled on it, it didn’t even measure a meter. So I had to search around and pull 5 meters of cable. I spent a lot of time trying to attach the photocell, but there was no way; it wasn’t the right length to install it properly on the glass, so I attached it with very strong double-sided tape. |