BIMANI – OVIEDO

Date08/05/2026
Contract CompanyTC Group / ITBASE
Company Infohttps://www.itbase.es/
Activity / TaskHardware Failure / Replacement
Client CompanyBimani
CityOviedo
Complete Date08/05/2026
Task DescriptionI proceeded to install the photocell, and the cable that the electrician had supposedly provided for the installation was just a decorative cable because when I pulled on it, it didn’t even measure a meter. So I had to search around and pull 5 meters of cable. I spent a lot of time trying to attach the photocell, but there was no way; it wasn’t the right length to install it properly on the glass, so I attached it with very strong double-sided tape.