| Date | 24/4/2024 |
| Contract Company | Tech Source Managed Services |
| Company Info | https://techsource-managed.com.au/ |
| Activity / Task | SDWAN, Switch, and Access point configuration / Installation |
| Client Company | Minova International |
| City | Gijon, Asturias |
| Complete Date | Incomplete |
| Job Description | Local assistance for the configuration and local installation on site devices: complete Minovas Networks Configuration. When i arrive we found conexion problems with the Movistar Modem to the SDWAN. and i start looking for the conexion problem, after few hours we found that one of the SW Ports of the modem was not working givin us conexion to the SDWAN, we have to connect cable to the old switch was the only way to get connection to internet. Assistance is required to complete the taks, assist the engineers to complete access point corporate wifi and install the devices. — Rack needs to be fix so the devices a cables fits in correctly. After this i start changing all cables to the new Cisco switch The only cable i have connected to the old switch was the SDWAN that provide internet to everything at the moment. the majorty of the cables were identified like this: SW Port 3 to Patch Panel # 3 SW Port 5 to Patch Panel # 5 SW Port 8 to Patch Panel # 8 SW Port 9 to Patch Panel # 9 office AP – Printer connected via WIFI to this AP SW Port 10 to Patch Panel # 10 originally to printer but this was not configure so i put one of the new Cisco AP Temporary SW Port 11 to Patch Panel # 11 SW Port 12 to Patch Panel # 12 SW Port 13 to Patch Panel # 13 SW Port 24 to Secondt Patch Panel # 24 SW Port 30 to Computer Server in Rack SW Port 45 to Cisco AP1 SW Port 46 to Cisco AP2 SW Port 48 to SDWAN Port LAN3 |

