| Date | 30/4/2024 |
| Contract Company | Tech Source Managed Services |
| Company Info | https://techsource-managed.com.au/ |
| Activity / Task | Switch, Access point & Printer configuration |
| Client Company | Minova International |
| City | Gijon, Asturias |
| Complete Date | Incomplete |
| Job Description | Local assistance for the configuration and local installation on site devices: complete Minovas Networks Configuration. My first task was to find the cable that goes from the main cisco switch to the factory, this cable was tag PP and Explain how the networks was connected: Factory cable conexion goes to a TPlink router/Switch/ with wifi conection has multiple wired conexion, (Computers, printers, prod machines and another switch ) this device also have 4 repeters, i also help defined how the networks works or get the DHCP to differents devices. I also move one access point to the end of the office & connected to wall port # 6 /PP A #6 /SW port #45 . I also configure the office printer to get DHCP from Cisco AP and connect to (Minovas Corp1) I fix a user computer conexión, Try to connect IP phone to the networks but was not possible. |

