| Date | 15/09/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Materials Layout |
| Client Company | BROWNIE Gijón |
| City | Gijón, Asturias |
| Complete Date | 15/09/26 |
| Task Description | Upon arriving at the site, I realized the project was significantly behind schedule, as most of the elements needed for the layout were missing; consequently, I made rough calculations after consulting with the electrician. The electrician will install a power point for the front and another for the rear, as well as UTP cabling for an outdoor sensor on each side. Photos were taken, and the remote technician was informed. |