| Date | 07/07/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | INCIDENT |
| Client Company | PEPCO, Los Prados |
| City | Oviedo, Asturias |
| Complete Date | 07/07/2026 |
| Job Description | The interior sensor was detached because where it was attached (a mesh ceiling), there wasn’t much room and it was only held in place with double-sided tape. So I applied new double-sided tape and cable ties to secure it firmly to the «ceiling.» After that, functionality tests were performed, and once everything was confirmed to be working correctly, I left. |


