| Date | 08/05/2026 |
| Contract Company | TC Group / ITBASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | Bimani |
| City | Oviedo |
| Complete Date | 08/05/2026 |
| Task Description | I proceeded to install the photocell, and the cable that the electrician had supposedly provided for the installation was just a decorative cable because when I pulled on it, it didn’t even measure a meter. So I had to search around and pull 5 meters of cable. I spent a lot of time trying to attach the photocell, but there was no way; it wasn’t the right length to install it properly on the glass, so I attached it with very strong double-sided tape. |
Mas Móvil
| Date | 05/05/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | New Hardware Installation |
| Client Company | MAS MOVIL |
| City | Pola de Siero, Asturias |
| Complete Date | 05/05/2026 |
| Task Description | The TC Core box and the indoor sensor were installed, but with considerable difficulty. Two UTP cables were prepared: one 5 meters for the outdoor unit and another 4 meters for the indoor unit. The outdoor sensor did not respond, and there were no screws available for mounting it to the concrete wall, so it was not installed. |
TC Group / ITBASE – BIMANI -OVIEDO
| Date | 05/05/2026 |
| Contract Company | TC Group / ITBASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | Bimani |
| City | Oviedo |
| Complete Date | 05/05/2026 |
| Task Description | The TC Core box and internal sensor were installed. It turns out the external sensor wasn’t in the box, but I had one to install (Forum Sport). However, after installing it and doing several tests with a remote technician (Max), the photocell didn’t work and they decided to send a new one. |
TC Group – ITBase – Forum Sport – Oviedo
| Date | 24/04/2026 |
| Contract Company | IT BASE / TC Group |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | FORUM SPORT |
| City | OVIEDO, Asturias |
| Complete Date | 24/04/2026 |
| Job Description | Network cable run and external sensor replacement, adjustment on the wall/Cristal showcase, final testing |
Mas Móvil
| Date | 24/04/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | MAS MOVIL |
| City | Aviles, Asturias |
| Complete Date | 24/04/2026 |
| Job Description | TC Core Unit replacement and sensors reconfiguration |
Silbon – Gijon
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Project Installation Planning |
| Client Company | SILBON, Gijon |
| City | Gijón, Asturias |
| Complete Date | 23/04/2026 |
| Job Description | Take pictures, and Take measurements of the width and height of the premises and way to get power for the sensor devices TC core, interior and exterior sensors. |
TC Group – ITBase – PEPCO – Oviedo
| Date | 21/04/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | PEPCO, Los Prados |
| City | Oviedo, Asturias |
| Complete Date | 21/04/2026 |
| Job Description | Exterior sensors replacement |
FORUM SPORT OVIEDO
| Date | 21/04/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacemente |
| Client Company | FORUM SPORT, Oviedo |
| City | Oviedo, Asturias |
| Complete Date | 21/04/2026 |
| Job Description | Re-establishment for External sensor |
MUY MUCHO Oviedo
| Date | 21/04/2026 |
| Contract Company | IT BASE |
| Company Info | https://www.itbase.es/ |
| Activity / Task | Hardware Failure / Replacement |
| Client Company | MUY MUCHO Oviedo |
| City | Oviedo, Asturias |
| Complete Date | 21/04/2026 |
| Job Description | Exterior sensors replacement |
LOLA CASA DEMUNT OVIEDO
| Date | 07/04/2026 |
| Contract Company | TC Group Solutions |
| Company Info | https://www.tcgroupsolutions.com/ |
| Activity / Task | Hardware Installation |
| Client Company | LOLA CASADEMUNT |
| City | Oviedo, Asturias |
| Complete Date | 07/04/2026 |
| Job Description | Wirelss sensors, and gateway intallation on changer |

